BM65 PRE-FABRICATED STEEL PIT
Product description
BM65 PRE-FABRICATED STEEL PIT
OPTIONS
All-in-one galvanized steel inspection pit for Roller Brake Tester and Wheel Play detector with side stair-entrance and hydraulic aluminum cover. The BM65 Pre-fabricated steel pit is a fast, easy and cost-effective installation indoor or outdoor.
OPTIONS
- Manufactured in hot galvanized steel and aluminum.
- Cable remote control of hydraulic aluminum cover.
- Hydraulic lift of inspection floor up to app 40 cm.
- Integrated sump-tank for easy management of waste and avoidance of connection to public sewer system.
- Installation of Brake tester and Wheel Play Detector.
- Stair side entrance.
- Installation directly on a sand-base without need for concreting.
- Optional side stair-entrance in either left of right side of pit for adaption to Left- respective Right hand drive or adaption to site space limitations.
TRANSPORT OF BM65
The BM65 pit can be transported inside a 20’ container from BM Autoteknik in Denmark to the customer’s site. The BM65 is equipped with a transport roller mounted on the outside of the pit, which allows for rolling the steel pit in- and out of the container using for example a forklift:
Alternatively, BM65 can be transported on a flatbed truck:
ROLLER BRAKE TESTER
Model BM14200 and BM18200 brake tester can be installed into
the BM65 steel pit.
The BM14200 is a conventional roller brake tester for test
of axles up to 16 ton. The BM14200 can be supplied with a
pull down axle load simulation system.
The BM18200 is a unique roller brake tester for test of axles
up to 16 ton. The BM18200 is supplied with a hydraulic
controlled lift of the rollerbed for load simulation.
The lifting height is 255 mm and lifting power is 16 Ton. A
unique axle tie-down system can be supplied with BM18200
brake tester.
Both BM14200 and BM18200 brake testers can be supplied with physical display, Windows software and/or Android Tablet solutions.
WHEEL PLAY DETECTOR
Model BM53000 wheel play detector can be installed into the BM65 steel pit.
The BM53000 is a hydraulic controlled wheel play detector for
wear test of axles up to 20 ton and operated via a robust
remote control unit.
The large 1000 mm x 850 mm plate moves 100 mm in eight
different direction and the plates autocentralize after
usage, so the wheel play detector is ready for test of the
next axle.
With maximum axle distances the operator can place axles on both the brake tester and the play detector and hereby conduct test of both before moving the vehicle forward.
Technical data
| Pit width |
4270 mm ( for 1000 mm roller length) |
|---|---|
| Pit length |
2180 mm |
| Pit depth |
1808 mm |
| Approximate total weight |
5,5 – 6 Ton (for 1000 mm roller length) |
| Inspection pit width |
450 mm (for 1250 mm roller length) |
| Inspection pit lift max depth |
1700 mm |
| Inspection pit lift min depth |
1300 mm |
| Operator tunnel ground clearance |
1600 mm |
| Brake tester max wheel track |
2850 mm (for 1000 mm roller length) |
| Brake tester roller distance |
700 mm (for 1250 mm roller length) |
| Brake tester min wheel track |
632 mm (for 1250 mm roller length) |
| BM53000 plate width |
1000 mm (for 1000 mm roller length) |
| BM53000 plate length |
825 mm |
| BM53000 max wheel track |
2850 mm (for 1000 mm roller length) |
| BM53000 min wheel track |
700 mm (for 1250 mm roller length) |
Advantages
- All-in-one galvanized steel inspection pit.
- Side stair-entrance
- Hydraulic aluminum cover.
- Fast, easy and cost-effective installation indoor or outdoor.
- Vertical movement of the inspection floor between left and right rollerbed.
- Can be supplied with a hydraulic controlled cover built in aluminum and controlled via a robust cable remote control.
- Operator tunnel with high clearance and slip safe floor.
- Can be supplied with strong working LED light.
- Can be supplied with a calendar/temperature-controlled heating system.
Installation
The BM65 is installed into a suitable hole and can be place directly on a compact sand-base. Hereafter the hole is just filled up with sand without the need of concreting.
The BM65 is equipped with 6 x outlets in the bottom, which can be used for cable draw, ventilation, and/or sewer connection.
Integrated sewer solution
BM65 can be supplied with an integrated metal sewer sump with submersible pump. This option can eliminate the need for connection to the public sewer system and may remove the need for related authority approvals.